From established homes in Berwick to new builds around Officer and Clyde North, plaster and plasterboard issues show up before paint ever looks right. Painting over them locks the problem in.
Hairline cracks along joints
Often caused by framing movement or imperfect jointing. We open, reinforce and re-set the joint so the crack does not telegraph through new paint.
Popped nails or screws
Fasteners working proud create bumps and cracks. Fixing means re-securing the sheet, setting fasteners correctly, then flushing with compound.
Water stains and soft spots
Never paint over active leaks. We identify moisture sources first, replace damaged sections, and use appropriate primers before colour coats.
Texture mismatches
Repairs that look smooth in daylight can still read as patches under evening lighting. We match texture carefully so repairs disappear after painting.
Complete restoration
M.R.M Painting & Maintenance offers plaster repairs plus priming and painting so you get one tidy finish. Learn about plaster repairs or book an estimate.
